United States βΊ Grid βΊ Interconnection queues βΊ Washington
ONSHORE WIND Β· WESTOnshore wind project G0814, Grays Harbor County
Onshore wind project G0814, Grays Harbor County is a 1,000 MW onshore wind request withdrawn in the West interconnection queue, in Grays Harbor County, Washington.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G0814
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Intalco Substation at 230 kV or alternate is Custer Substation at 500 kV
- Location
- Grays Harbor County, Washington
- Technology
- Wind: 1,000 MW
- Total requested
- 1,000 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 3 October 2022
- Proposed online date
- May 2030
Location
Marker shows the centre of Grays Harbor County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Grays Harbor County
- Gas project 54, Grays Harbor CountyGas Β· 199 MW Β· suspended
- Grays Harbor 1Gas Β· 659 MW Β· built
- Grays Harbor ProjectOther Β· 39.0 MW Β· built
- Coastal Energy ProjectOnshore wind Β· 6.0 MW Β· built
- Onshore wind project G0815, Grays Harbor CountyOnshore wind Β· 1,000 MW Β· withdrawn
- Wind + storage project G0735, Grays Harbor CountyWind + storage Β· 1,000 MW Β· withdrawn
- Onshore wind project G0816, Grays Harbor CountyOnshore wind Β· 1,000 MW Β· withdrawn
- Gas project G0289, Grays Harbor CountyGas Β· 628 MW Β· withdrawn
- Gas project G0321, Grays Harbor CountyGas Β· 290 MW Β· withdrawn
- Other project G0371, Grays Harbor CountyOther Β· 65.0 MW Β· withdrawn
- Gas project G0575, Grays Harbor CountyGas Β· 51.0 MW Β· withdrawn
- Onshore wind project G0360, Grays Harbor CountyOnshore wind Β· 6.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem