United States βΊ Grid βΊ Interconnection queues βΊ Indiana
BATTERY STORAGE Β· MISOBattery storage project J2263, Knox County
Battery storage project J2263, Knox County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in Knox County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedOct 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2263
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Edwardsport 345KV
- Location
- Knox County, Indiana
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 31 August 2021
- Proposed online date
- August 2024
- Withdrawn
- October 2024
Location
Marker shows the centre of Knox County; the queue data does not give exact sites.
Other requests in Knox County
- Solar project J1234, Knox CountySolar Β· 100 MW Β· agreement signed
- Solar project J1235, Knox CountySolar Β· 50.0 MW Β· agreement signed
- Onshore wind project J4063, Knox CountyOnshore wind Β· 300 MW Β· in study
- Solar project J1616, Knox CountySolar Β· 200 MW Β· in study
- Solar project J3731, Knox CountySolar Β· 160 MW Β· in study
- Solar + storage project S1120, Knox CountySolar + storage Β· 150 MW Β· in study
- Battery storage project J3166, Knox CountyBattery storage Β· 100 MW Β· in study
- Solar project J3896, Knox CountySolar Β· 70.0 MW Β· in study
- Solar project J3925, Knox CountySolar Β· 70.0 MW Β· in study
- Solar project J3897, Knox CountySolar Β· 60.0 MW Β· in study
- Battery storage project S1126, Knox CountyBattery storage Β· 50.0 MW Β· in study
- Gas project G431, Knox CountyGas Β· 420 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem