United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J618, Franklin Parish County
Solar project J618, Franklin Parish County is a 58.7 MW solar request withdrawn in the MISO interconnection queue, in Franklin Parish County, Louisiana.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2016 (completed)
- Withdrawn / abandonedMay 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J618
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Franklin Parish County, Louisiana
- Technology
- Solar: 58.7 MW
- Total requested
- 58.7 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 9 May 2016
- Proposed online date
- July 2018
- Withdrawn
- May 2017
Location
Marker shows the centre of Franklin Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Franklin Parish County
- Solar + storage project J3082, Franklin Parish CountySolar + storage Β· 135 MW Β· in study
- Solar project J4142, Franklin Parish CountySolar Β· 115 MW Β· in study
- Solar project J2693, Franklin Parish CountySolar Β· 105 MW Β· in study
- Solar project J2385, Franklin Parish CountySolar Β· 179 MW Β· withdrawn
- Solar project J3098, Franklin Parish CountySolar Β· 75.0 MW Β· withdrawn
- Solar project J659, Franklin Parish CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem