United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J3098, Franklin Parish County
Solar project J3098, Franklin Parish County is a 75.0 MW solar request withdrawn in the MISO interconnection queue, in Franklin Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3098
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- RED GUM - WINNSBORO 115 kV (122.5,122.6,122.7)
- Location
- Franklin Parish County, Louisiana
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- April 2027
- Withdrawn
- July 2025
Location
Marker shows the centre of Franklin Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Franklin Parish County
- Solar + storage project J3082, Franklin Parish CountySolar + storage Β· 135 MW Β· in study
- Solar project J4142, Franklin Parish CountySolar Β· 115 MW Β· in study
- Solar project J2693, Franklin Parish CountySolar Β· 105 MW Β· in study
- Solar project J2385, Franklin Parish CountySolar Β· 179 MW Β· withdrawn
- Solar project J618, Franklin Parish CountySolar Β· 58.7 MW Β· withdrawn
- Solar project J659, Franklin Parish CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem