United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· SPP

Gas project GEN-2011-031, Ector County

Gas project GEN-2011-031, Ector County is a 196 MW gas request withdrawn in the SPP interconnection queue, in Ector County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedOct 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2011-031
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Midland 230kV
Location
Ector County, Texas
Technology
Gas: 196 MW
Total requested
196 MW
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
December 2014
Withdrawn
October 2011

Location

Marker shows the centre of Ector County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Ector County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem