πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project G516, Nobles County

Onshore wind project G516, Nobles County is a 6.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Nobles County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2005 (completed)
  2. Withdrawn / abandonedJun 2005 (project stopped here)
  3. ConsentedJun 2005 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G516
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Nobles County, Minnesota
Technology
Wind: 6.0 MW
Total requested
6.0 MW
Queue status
Withdrawn
Entered queue
29 April 2005
Agreement signed
27 June 2005
Proposed online date
June 2006
Withdrawn
June 2005

Location

Marker shows the centre of Nobles County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Nobles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem