SOLAR Β· PJM

Solar project W1-051, Franklin County

Solar project W1-051, Franklin County is a 130 MW solar request withdrawn in the PJM interconnection queue, in Franklin County, Pennsylvania, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2010 (completed)
  2. Withdrawn / abandonedOct 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
W1-051
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
St. Thomas 34kV III
Location
Franklin County, Pennsylvania
Technology
Solar: 130 MW
Total requested
130 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
12 March 2010
Proposed online date
July 2012
Withdrawn
October 2011

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem