United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project H054, Redwood County

Onshore wind project H054, Redwood County is a 40.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Redwood County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2008 (completed)
  2. Withdrawn / abandonedMar 2010 (project stopped here)
  3. ConsentedMar 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
H054
Grid region
MISO (Midcontinent)
Connection point (POI)
Xcel Morgan 69 kV Substation
Location
Redwood County, Minnesota
Technology
Wind: 40.0 MW
Total requested
40.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
12 June 2008
Agreement signed
29 March 2010
Proposed online date
December 2011
Withdrawn
March 2010

Location

Marker shows the centre of Redwood County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Redwood County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem