United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

BATTERY STORAGE Β· MISO

Battery storage project J3665, Redwood County

Battery storage project J3665, Redwood County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in Redwood County, Minnesota, connecting to SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3665
Grid region
MISO (Midcontinent)
Utility / transmission owner
SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY
Connection point (POI)
Redwood Falls Tap - Redwood Falls West 115.0kV
Location
Redwood County, Minnesota
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
15 April 2024
Proposed online date
December 2028
Withdrawn
September 2025

Location

Marker shows the centre of Redwood County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Redwood County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem