United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
BATTERY STORAGE Β· MISOBattery storage project J3665, Redwood County
Battery storage project J3665, Redwood County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in Redwood County, Minnesota, connecting to SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3665
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY
- Connection point (POI)
- Redwood Falls Tap - Redwood Falls West 115.0kV
- Location
- Redwood County, Minnesota
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 15 April 2024
- Proposed online date
- December 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of Redwood County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Redwood County
- Battery storage project J4072, Redwood CountyBattery storage Β· 500 MW Β· in study
- Solar project J4152, Redwood CountySolar Β· 250 MW Β· in study
- Solar project J4151, Redwood CountySolar Β· 225 MW Β· in study
- Solar project J2599, Redwood CountySolar Β· 216 MW Β· in study
- Battery storage project J3704, Redwood CountyBattery storage Β· 200 MW Β· in study
- Onshore wind project J2053, Redwood CountyOnshore wind Β· 152 MW Β· in study
- Onshore wind project J1106, Redwood CountyOnshore wind Β· 414 MW Β· withdrawn
- Onshore wind project J901, Redwood CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J3705, Redwood CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project H051, Redwood CountyOnshore wind Β· 40.0 MW Β· withdrawn
- Onshore wind project H055, Redwood CountyOnshore wind Β· 40.0 MW Β· withdrawn
- Onshore wind project H054, Redwood CountyOnshore wind Β· 40.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem