United States βΊ Grid βΊ Interconnection queues βΊ Utah
SOLAR + STORAGE Β· WESTSolar + storage project 1232, Iron County
Solar + storage project 1232, Iron County is a 455 MW solar + storage request withdrawn in the West interconnection queue, in Iron County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1232
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Sigurd-Three Peaks transmission line
- Location
- Iron County, Utah
- Technology
- Solar: 455 MW Β· Battery
- Total requested
- 455 MW
- Service type
- NRIS and ERIS
- Study phase
- Request submitted post queue reform effective date
- Queue status
- Withdrawn
- Entered queue
- 5 May 2020
- Proposed online date
- December 2023
Location
Marker shows the centre of Iron County; the queue data does not give exact sites.
Other requests in Iron County
- Solar project 636, Iron CountySolar Β· 99.0 MW Β· agreement signed
- Battery storage project S0010, Iron CountyBattery storage Β· 80.0 MW Β· agreement signed
- Battery storage project S0011, Iron CountyBattery storage Β· 80.0 MW Β· agreement signed
- Battery storage project S0013, Iron CountyBattery storage Β· 80.0 MW Β· agreement signed
- Battery storage project S0012, Iron CountyBattery storage Β· 50.0 MW Β· agreement signed
- Solar + storage project C2-39, Iron CountySolar + storage Β· 300 MW Β· in study
- Solar + storage project T2-028, Iron CountySolar + storage Β· 300 MW Β· in study
- Solar + storage project PIS049, Iron CountySolar + storage Β· 300 MW Β· in study
- Solar + storage project T2-053, Iron CountySolar + storage Β· 248 MW Β· in study
- Battery storage project S0017, Iron CountyBattery storage Β· 200 MW Β· in study
- Solar + storage project 642, Iron CountySolar + storage Β· 58.0 MW Β· in study
- Solar project 763, Iron CountySolar Β· 200 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem