BATTERY STORAGE Β· PJMBattery storage project AB1-147, Beaver County
Battery storage project AB1-147, Beaver County is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Beaver County, Pennsylvania, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2015 (completed)
- Withdrawn / abandonedMar 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB1-147
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Hoytdale 138kV
- Location
- Beaver County, Pennsylvania
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 October 2015
- Proposed online date
- November 2016
- Withdrawn
- March 2016
Location
Marker shows the centre of Beaver County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Beaver County
- Battery storage project AG2-621, Beaver CountyBattery storage Β· 150 MW Β· in study
- Solar + storage project AH2-253, Beaver CountySolar + storage Β· 70.0 MW Β· in study
- Solar project AH2-063, Beaver CountySolar Β· 20.0 MW Β· in study
- Solar project AH2-064, Beaver CountySolar Β· 10.0 MW Β· in study
- Nuclear project N13, Beaver CountyNuclear Β· 1,630 MW Β· built
- Pennsylvania Chemicals Generating FacilityGas Β· 205 MW Β· built
- Beaver Valley 1Nuclear Β· 81.0 MW Β· built
- Beaver Valley 2Nuclear Β· 77.0 MW Β· built
- Coal project G541, Beaver CountyCoal Β· 50.0 MW Β· built
- Coal project G543, Beaver CountyCoal Β· 50.0 MW Β· built
- Beaver Valley Power StationNuclear Β· 48.0 MW Β· built
- Beaver Valley Power StationNuclear Β· 43.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem