πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

HYDRO Β· PJM

Hydro project Z2-037, Muskingum County

Hydro project Z2-037, Muskingum County is a 4.0 MW hydro request withdrawn in the PJM interconnection queue, in Muskingum County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2014 (completed)
  2. Withdrawn / abandonedSep 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Z2-037
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Clean River Power MR-7 (Philo)
Location
Muskingum County, Ohio
Technology
Hydro: 4.0 MW
Total requested
4.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
27 February 2014
Proposed online date
December 2016
Withdrawn
September 2014

Location

Marker shows the centre of Muskingum County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Muskingum County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem