United States βΊ Grid βΊ Interconnection queues βΊ Ohio
OTHER Β· PJMZanesville Energy
Zanesville Energy is a 0.9 MW other request built and operating in the PJM interconnection queue, in Muskingum County, Ohio, connecting to AEP.
Request details
- Queue ID
- W3-063
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- South Fultonham 4kV
- Location
- Muskingum County, Ohio
- Technology
- Other: 0.9 MW
- Total requested
- 0.9 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Operational
- Entered queue
- 17 September 2010
- Proposed online date
- May 2011
- Came online
- May 2011
- Withdrawn
- September 2018
Location
Marker shows the centre of Muskingum County; the queue data does not give exact sites.
Other requests in Muskingum County
- Other project AH1-661, Muskingum CountyOther Β· 10.1 MW Β· in study
- DresdenGas Β· 580 MW Β· built
- DresdenGas Β· 98.0 MW Β· built
- Conesville #5Coal Β· 5.0 MW Β· built
- Conesville #6Coal Β· 5.0 MW Β· built
- Gas project P02, Muskingum CountyGas Β· 550 MW Β· withdrawn
- Battery storage project AH1-754, Muskingum CountyBattery storage Β· 500 MW Β· withdrawn
- Solar project AC1-024, Muskingum CountySolar Β· 150 MW Β· withdrawn
- Muskingum SolarSolar Β· 150 MW Β· withdrawn
- Solar project AD2-151, Muskingum CountySolar Β· 100 MW Β· withdrawn
- Solar project AC2-054, Muskingum CountySolar Β· 10.0 MW Β· withdrawn
- Hydro project Z2-037, Muskingum CountyHydro Β· 4.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem