United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· WEST

Pi1000G

Pi1000G is a 1,034 MW gas request withdrawn in the West interconnection queue, in El Paso County, Texas, connecting to El Paso Electric Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q25-LG-6-10-0
Grid region
West (non-ISO utilities)
Utility / transmission owner
El Paso Electric Company
Connection point (POI)
Pine 345 kV Substation
Location
El Paso County, Texas
Technology
Gas: 1,034 MW
Total requested
1,034 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
10 June 2025
Proposed online date
December 2028

Location

Marker shows the centre of El Paso County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in El Paso County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem