Solar is a 20.0 MW solar request withdrawn in the ISO-NE interconnection queue, in York County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2024 (completed)
  2. Withdrawn / abandonedAug 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1573
Grid region
ISO-NE (New England)
Connection point (POI)
CMP 34.5kV Line 182, located approximately 2.5 miles from the West Buxton Substation.
Location
York County, Maine
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
26 June 2024
Proposed online date
June 2028
Withdrawn
August 2024

Location

Marker shows the centre of York County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in York County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem