Battery storage project J1954, Walworth County

Battery storage project J1954, Walworth County is a 35.0 MW battery storage request withdrawn in the MISO interconnection queue, in Walworth County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedJun 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1954
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMERICAN TRANSMISSION COMPANY
Connection point (POI)
SW Delavan 138kV
Location
Walworth County, Wisconsin
Technology
Battery: 35.0 MW
Total requested
35.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: Re-Study; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
24 August 2021
Proposed online date
October 2025
Withdrawn
June 2023

Location

Marker shows the centre of Walworth County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Walworth County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem