United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
SOLAR Β· MISOSolar project J1955, Walworth County
Solar project J1955, Walworth County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Walworth County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedJun 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1955
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMERICAN TRANSMISSION COMPANY
- Connection point (POI)
- SW Delavan 138kV
- Location
- Walworth County, Wisconsin
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: Re-Study; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 24 August 2021
- Proposed online date
- October 2025
- Withdrawn
- June 2023
Location
Marker shows the centre of Walworth County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Walworth County
- Gas project J4116, Walworth CountyGas Β· 950 MW Β· in study
- Gas project J4028, Walworth CountyGas Β· 324 MW Β· in study
- Solar project J2666, Walworth CountySolar Β· 100 MW Β· in study
- Other project G138, Walworth CountyOther Β· 352 MW Β· withdrawn
- Solar project J1044, Walworth CountySolar Β· 200 MW Β· withdrawn
- Solar project J1047, Walworth CountySolar Β· 200 MW Β· withdrawn
- Solar project J1042, Walworth CountySolar Β· 200 MW Β· withdrawn
- Solar project J798, Walworth CountySolar Β· 124 MW Β· withdrawn
- Solar project J1740, Walworth CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project G546, Walworth CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project G379, Walworth CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project G288, Walworth CountyOnshore wind Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem