Onshore wind project J537, Sanilac County

Onshore wind project J537, Sanilac County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Sanilac County, Michigan.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2015 (completed)
  2. Withdrawn / abandonedJul 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J537
Grid region
MISO (Midcontinent)
Connection point (POI)
1.5 miles south of Banner 345 kV substation
Location
Sanilac County, Michigan
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
GIA
Queue status
Withdrawn
Entered queue
16 November 2015
Proposed online date
October 2017
Withdrawn
July 2017

Location

Marker shows the centre of Sanilac County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Sanilac County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem