United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

ONSHORE WIND Β· MISO

Onshore wind project G679, Mclean County

Onshore wind project G679, Mclean County is a 9.9 MW onshore wind request withdrawn in the MISO interconnection queue, in Mclean County, Illinois.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2006 (completed)
  2. Withdrawn / abandonedSep 2006 (project stopped here)
  3. ConsentedSep 2006 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G679
Grid region
MISO (Midcontinent)
Connection point (POI)
Ameren 34.5 kV line near Lexington, IL
Location
Mclean County, Illinois
Technology
Wind: 9.9 MW
Total requested
9.9 MW
Queue status
Withdrawn
Entered queue
11 September 2006
Agreement signed
28 September 2006
Proposed online date
June 2012
Withdrawn
September 2006

Location

Marker shows the centre of Mclean County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Mclean County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem