πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR + STORAGE Β· WEST

Solar + storage project CS25-12, Garfield County

Solar + storage project CS25-12, Garfield County is a 160 MW solar + storage request withdrawn in the West interconnection queue, in Garfield County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2025 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
CS25-12
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Dry Creek - Talbot 230kV
Location
Garfield County, Washington
Technology
Solar: 160 MW Β· Battery
Total requested
160 MW
Service type
NRIS and ERIS
Study phase
Request Status: Withdrawn; Phase One Cluster Study: Complete
Queue status
Withdrawn
Entered queue
29 April 2025
Proposed online date
December 2029
Withdrawn
October 2025

Location

Marker shows the centre of Garfield County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Garfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem