United States βΊ Grid βΊ Interconnection queues βΊ New York
OFFSHORE WIND Β· NYISOOffshore Wind
Offshore Wind is a 700 MW offshore wind request withdrawn in the NYISO interconnection queue, in New York County, New York, connecting to LIPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2009 (completed)
- Withdrawn / abandonedJun 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 327
- Grid region
- NYISO (New York)
- Utility / transmission owner
- LIPA
- Developer
- Con Edison
- Connection point (POI)
- Far Rockaway 69kV
- Location
- New York County, New York
- Technology
- Offshore Wind: 700 MW
- Total requested
- 700 MW
- Queue status
- Withdrawn
- Entered queue
- 20 March 2009
- Withdrawn
- June 2011
Location
Marker shows the centre of New York County; the queue data does not give exact sites.
Other requests in New York County
- East River RepoweringGas Β· 288 MW Β· built
- East River RepoweringGas Β· 288 MW Β· built
- KeySpan RavenswoodGas Β· 270 MW Β· built
- KeySpan RavenswoodGas Β· 270 MW Β· built
- Hell GateGas Β· 79.9 MW Β· built
- Harlem River YardsGas Β· 79.9 MW Β· built
- Harlem River YardsGas Β· 79.9 MW Β· built
- Hell GateGas Β· 79.9 MW Β· built
- Vernon BlvdGas Β· 79.9 MW Β· built
- Vernon BlvdGas Β· 79.9 MW Β· built
- 23rd St and 3rd AveGas Β· 79.9 MW Β· built
- 23rd St and 3rd AveGas Β· 79.9 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem