BATTERY STORAGE Β· SPP

Battery storage project GEN-2018-091, Wilbarger County

Battery storage project GEN-2018-091, Wilbarger County is a 250 MW battery storage request withdrawn in the SPP interconnection queue, in Wilbarger County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-091
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Oklaunion-Tuco 345kV Line Break
Location
Wilbarger County, Texas
Technology
Battery: 250 MW
Total requested
250 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
21 November 2018
Proposed online date
December 2027
Withdrawn
December 2022

Location

Marker shows the centre of Wilbarger County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Wilbarger County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem