United States › Grid › Interconnection queues › Louisiana
SOLAR · MISOSolar project J2643, Washington Parish County
Solar project J2643, Washington Parish County is a 150 MW solar request in interconnection study in the MISO interconnection queue, in Washington Parish County, Louisiana, connecting to ENTERGY MISSISSIPPI, LLC..
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2643
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- BOGALUSA - DEXTER SS (CE) 115.0kV
- Location
- Washington Parish County, Louisiana
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 12 September 2022
- Proposed online date
- October 2027
Location
Marker shows the centre of Washington Parish County; the queue data does not give exact sites.
Other requests in Washington Parish County
- Solar project J1361, Washington Parish CountySolar · 50.0 MW · under construction
- Solar project J1184, Washington Parish CountySolar · 50.0 MW · under construction
- Solar project J1576, Washington Parish CountySolar · 200 MW · agreement signed
- Solar project J1564, Washington Parish CountySolar · 100 MW · agreement signed
- Solar project J3055, Washington Parish CountySolar · 250 MW · withdrawn
- Solar + storage project J3056, Washington Parish CountySolar + storage · 200 MW · withdrawn
- Solar project J3054, Washington Parish CountySolar · 200 MW · withdrawn
- Solar project J2743, Washington Parish CountySolar · 175 MW · withdrawn
- Solar + storage project J3211, Washington Parish CountySolar + storage · 100 MW · withdrawn
- Battery storage project J1906, Washington Parish CountyBattery storage · 100 MW · withdrawn
- Solar project J1506, Washington Parish CountySolar · 100 MW · withdrawn
- Battery storage project J1505, Washington Parish CountyBattery storage · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem