United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
BATTERY STORAGE Β· MISOBattery storage project J1505, Washington Parish County
Battery storage project J1505, Washington Parish County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Washington Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedDec 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1505
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- Talisheek - Bogalusa 230 kV Line
- Location
- Washington Parish County, Louisiana
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 25 June 2020
- Proposed online date
- September 2023
- Withdrawn
- December 2020
Location
Marker shows the centre of Washington Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Washington Parish County
- Solar project J1361, Washington Parish CountySolar Β· 50.0 MW Β· under construction
- Solar project J1184, Washington Parish CountySolar Β· 50.0 MW Β· under construction
- Solar project J1576, Washington Parish CountySolar Β· 200 MW Β· agreement signed
- Solar project J1564, Washington Parish CountySolar Β· 100 MW Β· agreement signed
- Solar project J2643, Washington Parish CountySolar Β· 150 MW Β· in study
- Solar project J3055, Washington Parish CountySolar Β· 250 MW Β· withdrawn
- Solar + storage project J3056, Washington Parish CountySolar + storage Β· 200 MW Β· withdrawn
- Solar project J3054, Washington Parish CountySolar Β· 200 MW Β· withdrawn
- Solar project J2743, Washington Parish CountySolar Β· 175 MW Β· withdrawn
- Solar + storage project J3211, Washington Parish CountySolar + storage Β· 100 MW Β· withdrawn
- Battery storage project J1906, Washington Parish CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project J1506, Washington Parish CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem