SOLAR Β· MISOSolar project J1703, Webster County
Solar project J1703, Webster County is a 74.0 MW solar request withdrawn in the MISO interconnection queue, in Webster County, Kentucky, connecting to BIG RIVERS ELECTRIC CORPORATION.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2022 (completed)
- Withdrawn / abandonedJul 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1703
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- BIG RIVERS ELECTRIC CORPORATION
- Connection point (POI)
- Reid to Hopkins County 161kV
- Location
- Webster County, Kentucky
- Technology
- Solar: 74.0 MW
- Total requested
- 74.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 11 February 2022
- Proposed online date
- September 2023
- Withdrawn
- July 2023
Location
Marker shows the centre of Webster County; the queue data does not give exact sites.
Other requests in Webster County
- Solar project J1450, Webster CountySolar Β· 150 MW Β· agreement signed
- Solar project J1619, Webster CountySolar Β· 160 MW Β· in study
- Surplus; J1450Other Β· 150 MW Β· in study
- Gas project J3089, Webster CountyGas Β· 696 MW Β· withdrawn
- Battery storage project J1901, Webster CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project LGE-GIS-2019-005, Webster CountySolar Β· 80.0 MW Β· withdrawn
- Battery storage project J3033, Webster CountyBattery storage Β· 75.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem