BATTERY STORAGE Β· MISOBattery storage project J1901, Webster County
Battery storage project J1901, Webster County is a 200 MW battery storage request withdrawn in the MISO interconnection queue, in Webster County, Kentucky, connecting to BIG RIVERS ELECTRIC CORPORATION.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1901
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- BIG RIVERS ELECTRIC CORPORATION
- Connection point (POI)
- South Henderson
- Location
- Webster County, Kentucky
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 25 March 2022
- Proposed online date
- September 2024
- Withdrawn
- December 2025
Location
Marker shows the centre of Webster County; the queue data does not give exact sites.
Other requests in Webster County
- Solar project J1450, Webster CountySolar Β· 150 MW Β· agreement signed
- Solar project J1619, Webster CountySolar Β· 160 MW Β· in study
- Surplus; J1450Other Β· 150 MW Β· in study
- Gas project J3089, Webster CountyGas Β· 696 MW Β· withdrawn
- Solar project LGE-GIS-2019-005, Webster CountySolar Β· 80.0 MW Β· withdrawn
- Battery storage project J3033, Webster CountyBattery storage Β· 75.0 MW Β· withdrawn
- Solar project J1703, Webster CountySolar Β· 74.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem