United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

BATTERY STORAGE Β· NYISO

Roma Storage 2

Roma Storage 2 is a 255 MW battery storage request withdrawn in the NYISO interconnection queue, in Queens County, New York, connecting to ConEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2023 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1602
Grid region
NYISO (New York)
Utility / transmission owner
ConEd
Developer
Roma Storage LLC
Connection point (POI)
ConEd Vernon 138KV Substation
Location
Queens County, New York
Technology
Battery: 255 MW
Total requested
255 MW
Queue status
Withdrawn
Entered queue
5 September 2023
Withdrawn
October 2023

Location

Marker shows the centre of Queens County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Queens County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem