United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

BATTERY STORAGE Β· SPP

Battery storage project GEN-2019-049, Caddo Parish County

Battery storage project GEN-2019-049, Caddo Parish County is a 60.0 MW battery storage request withdrawn in the SPP interconnection queue, in Caddo Parish County, Louisiana, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2019-049
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Flournoy 138kV Substation
Location
Caddo Parish County, Louisiana
Technology
Battery: 60.0 MW
Total requested
60.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
24 May 2019
Proposed online date
December 2027
Withdrawn
December 2022

Location

Marker shows the centre of Caddo Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Caddo Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem