United States βΊ Grid βΊ Interconnection queues βΊ Maine
SOLAR Β· ISO-NESolar
Solar is a 18.4 MW solar request withdrawn in the ISO-NE interconnection queue, in York County, Maine, connecting to CMP.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2019 (completed)
- Withdrawn / abandonedApr 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 946
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- CMP
- Connection point (POI)
- CMP 34.5 kv, Section 182
- Location
- York County, Maine
- Technology
- Solar: 18.4 MW
- Total requested
- 18.4 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 27 December 2019
- Proposed online date
- August 2021
- Withdrawn
- April 2020
Location
Marker shows the centre of York County; the queue data does not give exact sites.
Other requests in York County
- GDC Saco SolarSolar Β· 20.0 MW Β· agreement signed
- Emery Meadow SolarSolar Β· 16.4 MW Β· agreement signed
- SolarSolar Β· 180 MW Β· in study
- Sanford Airport SolarSolar Β· 50.0 MW Β· built
- Mousam River SolarSolar Β· 20.0 MW Β· built
- Westbrook Energy Center ExpansionGas Β· 9.5 MW Β· built
- Bonny Eagle Energy Storage - UprateOther Β· 8.0 MW Β· built
- SolarSolar Β· 4.8 MW Β· built
- Skelton Station Modernization Phase 1Hydro Β· 1.1 MW Β· built
- SolarSolar Β· 150 MW Β· withdrawn
- Battery StorageBattery storage Β· 50.7 MW Β· withdrawn
- SolarSolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem