United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR Β· PJMSolar project AG1-312, Bertie County
Solar project AG1-312, Bertie County is a 140 MW solar request withdrawn in the PJM interconnection queue, in Bertie County, North Carolina, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-312
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Earleys-Cashie 230 kV
- Location
- Bertie County, North Carolina
- Technology
- Solar: 140 MW
- Total requested
- 140 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 29 September 2020
- Proposed online date
- December 2023
- Withdrawn
- March 2021
Location
Marker shows the centre of Bertie County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Bertie County
- Sumac SolarSolar Β· 80.0 MW Β· agreement signed
- Solar project AG2-382, Bertie CountySolar Β· 70.0 MW Β· in study
- Solar project AH1-271, Bertie CountySolar Β· 40.0 MW Β· in study
- Kelford Solar ParkSolar Β· 20.0 MW Β· built
- Kelford Solar ParkSolar Β· 3.1 MW Β· built
- Solar project AD1-132, Bertie CountySolar Β· 150 MW Β· withdrawn
- Solar project AG1-437, Bertie CountySolar Β· 100 MW Β· withdrawn
- Solar project AC2-063, Bertie CountySolar Β· 100 MW Β· withdrawn
- Solar project AG1-438, Bertie CountySolar Β· 100 MW Β· withdrawn
- Solar + storage project AE1-026, Bertie CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar + storage project AD2-184, Bertie CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar + storage project AE1-024, Bertie CountySolar + storage Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem