United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOMaplewood Energy Storage
Maplewood Energy Storage is a 250 MW battery storage request withdrawn in the NYISO interconnection queue, in Albany County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1233
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- ACE Development Company
- Connection point (POI)
- Maplewood - Menands 115kV Line #19 & Maplewood - Reynolds 115kV Line #31
- Location
- Albany County, New York
- Technology
- Battery: 250 MW
- Total requested
- 250 MW
- Queue status
- Withdrawn
- Entered queue
- 20 August 2021
- Withdrawn
- October 2023
Location
Marker shows the centre of Albany County; the queue data does not give exact sites.
Other requests in Albany County
- Elevate BethlehemBattery storage · 120 MW · in study
- Bethlehem Energy CenterGas · 350 MW · built
- Bethlehem Energy CenterGas · 350 MW · built
- Bethlehem Energy Center UprateGas · 72.0 MW · built
- Bethlehem Energy Center UprateGas · 72.0 MW · built
- Albany County 2Solar · 20.0 MW · built
- Albany County 1Solar · 20.0 MW · built
- Albany County 2Solar · 20.0 MW · built
- Albany County 1Solar · 20.0 MW · built
- Albany LandfillOther · 6.4 MW · built
- Albany LandfillOther · 6.4 MW · built
- MM Albany LandfillOther · 4.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem