United States › Grid › Interconnection queues › Connecticut
BATTERY STORAGE · ISO-NEBattery Storage Addition
Battery Storage Addition is a 16.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in New London County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1249
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Tunnel 23 kV Substation
- Location
- New London County, Connecticut
- Technology
- Battery: 16.0 MW
- Total requested
- 16.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 19 April 2022
- Proposed online date
- May 2027
- Withdrawn
- March 2023
Location
No county location in the queue data.
Power plants in Connecticut · Transmission lines in Connecticut
Other requests in New London County
- Millstone 2 Upgrade7Nuclear · 906 MW · built
- Increase Existing CapacityNuclear · 70.0 MW · built
- Millstone IncreaseNuclear · 37.0 MW · built
- Fusion Solar CenterSolar · 20.0 MW · built
- SolarSolar · 17.7 MW · built
- SolarSolar · 15.0 MW · built
- Rand-Whitney Co-GenGas · 14.9 MW · built
- Foxwoods Central PlantGas · 13.2 MW · built
- Bloom Energy Fuel CellOther · 10.2 MW · built
- SolarSolar · 10.0 MW · built
- Battery StorageBattery storage · 300 MW · withdrawn
- Battery StorageBattery storage · 289 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem