United States β€Ί Grid β€Ί Interconnection queues β€Ί Nebraska

SOLAR Β· SPP

Solar project GEN-2021-105, Lancaster County

Solar project GEN-2021-105, Lancaster County is a 200 MW solar request withdrawn in the SPP interconnection queue, in Lancaster County, Nebraska, connecting to NPPD.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2021 (completed)
  2. Withdrawn / abandonedJul 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2021-105
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
NPPD
Connection point (POI)
Line side tap using three breaker ring bus on 230kV Feeder from Gerald Gentleman to North Platte
Location
Lancaster County, Nebraska
Technology
Solar: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
26 May 2021
Proposed online date
October 2027
Withdrawn
July 2023

Location

Marker shows the centre of Lancaster County; the queue data does not give exact sites.

Power plants in Nebraska Β· Transmission lines in Nebraska

Other requests in Lancaster County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem