United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMCarvers Creek LLC
Carvers Creek LLC is a 40.0 MW battery storage request withdrawn in the PJM interconnection queue, in Gloucester County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-355
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Carvers Creek LLC
- Connection point (POI)
- Owl Trap Switching Station 115kV
- Location
- Gloucester County, Virginia
- Technology
- Battery: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 10 September 2021
- Proposed online date
- September 2024
- Withdrawn
- March 2025
Location
Marker shows the centre of Gloucester County; the queue data does not give exact sites.
Other requests in Gloucester County
- Battery storage project AI2-318, Gloucester CountyBattery storage · 12.8 MW · in study
- Carvers Creek SolarSolar · 80.0 MW · built
- Carvers Creek SolarSolar · 50.0 MW · built
- Winterberry SolarSolar · 20.0 MW · built
- Carvers Creek SolarSolar · 20.0 MW · built
- Camellia SolarSolar · 19.9 MW · built
- Gloucester SolarSolar · 19.8 MW · built
- Middle Pennisula Gas to Energy Power PlantOther · 6.2 MW · built
- Solar + storage project AF1-201, Gloucester CountySolar + storage · 150 MW · withdrawn
- Solar project AG2-058, Gloucester CountySolar · 70.0 MW · withdrawn
- Battery storage project AG1-102, Gloucester CountyBattery storage · 19.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem