United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AG2-058, Gloucester County
Solar project AG2-058, Gloucester County is a 70.0 MW solar request withdrawn in the PJM interconnection queue, in Gloucester County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2020 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-058
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Harmony Village-White Marsh 115 kV
- Location
- Gloucester County, Virginia
- Technology
- Solar: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 8 December 2020
- Proposed online date
- June 2024
- Withdrawn
- December 2024
Location
Marker shows the centre of Gloucester County; the queue data does not give exact sites.
Other requests in Gloucester County
- Battery storage project AI2-318, Gloucester CountyBattery storage Β· 12.8 MW Β· in study
- Carvers Creek SolarSolar Β· 80.0 MW Β· built
- Carvers Creek SolarSolar Β· 50.0 MW Β· built
- Winterberry SolarSolar Β· 20.0 MW Β· built
- Carvers Creek SolarSolar Β· 20.0 MW Β· built
- Camellia SolarSolar Β· 19.9 MW Β· built
- Gloucester SolarSolar Β· 19.8 MW Β· built
- Middle Pennisula Gas to Energy Power PlantOther Β· 6.2 MW Β· built
- Solar + storage project AF1-201, Gloucester CountySolar + storage Β· 150 MW Β· withdrawn
- Carvers Creek LLCBattery storage Β· 40.0 MW Β· withdrawn
- Battery storage project AG1-102, Gloucester CountyBattery storage Β· 19.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem