United States › Grid › Interconnection queues › Virginia

OTHER · PJM

Middle Pennisula Gas to Energy Power Plant

Middle Pennisula Gas to Energy Power Plant is a 6.2 MW other request built and operating in the PJM interconnection queue, in Gloucester County, Virginia, connecting to Dominion.

Queue statusOperating
  1. PlanningQueued Oct 2007 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingOct 2009 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
T79
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Shacklefords 34.5kv
Location
Gloucester County, Virginia
Technology
Other: 6.2 MW
Total requested
6.2 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
5 October 2007
Proposed online date
October 2009
Came online
October 2009

Location

Marker shows the centre of Gloucester County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Gloucester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem