πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί New Mexico

SOLAR Β· SPP

Solar project GEN-2017-102, Roosevelt County

Solar project GEN-2017-102, Roosevelt County is a 67.5 MW solar request withdrawn in the SPP interconnection queue, in Roosevelt County, New Mexico, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedSep 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingApr 2020 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-102
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Crossroads 345kV
Location
Roosevelt County, New Mexico
Technology
Solar: 67.5 MW
Total requested
67.5 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 April 2020
Proposed online date
April 2020
Came online
April 2020
Withdrawn
September 2022

Location

Marker shows the centre of Roosevelt County; the queue data does not give exact sites.

Power plants in New Mexico Β· Transmission lines in New Mexico

Other requests in Roosevelt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem