United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

SOLAR + STORAGE Β· WEST

Solar + storage project Q37, Clark County

Solar + storage project Q37, Clark County is a 200 MW solar + storage request withdrawn in the West interconnection queue, in Clark County, Nevada, connecting to Los Angeles Department of Water and Power.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q37
Grid region
West (non-ISO utilities)
Utility / transmission owner
Los Angeles Department of Water and Power
Connection point (POI)
Marketplace Substation
Location
Clark County, Nevada
Technology
Solar: 100 MW Β· Battery: 100 MW
Total requested
200 MW
Study phase
Facility Study
Queue status
Withdrawn
Entered queue
28 November 2012
Proposed online date
April 2015

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem