United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

SOLAR Β· MISO

Solar project J3482, Mclean County

Solar project J3482, Mclean County is a 350 MW solar request withdrawn in the MISO interconnection queue, in Mclean County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3482
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
Other_
Location
Mclean County, Illinois
Technology
Solar: 350 MW
Total requested
350 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
16 April 2024
Proposed online date
September 2028
Withdrawn
December 2025

Location

Marker shows the centre of Mclean County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Mclean County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem