United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

ONSHORE WIND Β· MISO

Onshore wind project J724, Grant County

Onshore wind project J724, Grant County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Grant County, South Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2016 (completed)
  2. Withdrawn / abandonedJul 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J724
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Grant County, South Dakota
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
24 October 2016
Proposed online date
July 2020
Withdrawn
July 2017

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem