Battery storage project J4136, Grant County

Battery storage project J4136, Grant County is a 250 MW battery storage request withdrawn in the MISO interconnection queue, in Grant County, South Dakota, connecting to OTTER TAIL POWER COMPANY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2025 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J4136
Grid region
MISO (Midcontinent)
Utility / transmission owner
OTTER TAIL POWER COMPANY
Connection point (POI)
Big Stone South 345kV
Location
Grant County, South Dakota
Technology
Battery: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
3 October 2025
Proposed online date
April 2030
Withdrawn
December 2025

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem