United States βΊ Grid βΊ Interconnection queues βΊ Indiana
ONSHORE WIND Β· PJMOnshore wind project AH1-289, Vermillion County
Onshore wind project AH1-289, Vermillion County is a 300 MW onshore wind request withdrawn in the PJM interconnection queue, in Vermillion County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-289
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Eugene 345 kV
- Location
- Vermillion County, Indiana
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 9 September 2021
- Proposed online date
- May 2028
- Withdrawn
- December 2024
Location
Marker shows the centre of Vermillion County; the queue data does not give exact sites.
Other requests in Vermillion County
- Solar project J1348, Vermillion CountySolar Β· 200 MW Β· agreement signed
- Gas project J3999, Vermillion CountyGas Β· 1,540 MW Β· in study
- Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2Gas Β· 1,040 MW Β· in study
- Gas project J3232, Vermillion CountyGas Β· 500 MW Β· in study
- Solar project AH2-257, Vermillion CountySolar Β· 400 MW Β· in study
- Vermilion Grove WindOnshore wind Β· 255 MW Β· in study
- Solar project J1518, Vermillion CountySolar Β· 185 MW Β· in study
- Solar + storage project AH2-153, Vermillion CountySolar + storage Β· 180 MW Β· in study
- Solar + storage project AH2-154, Vermillion CountySolar + storage Β· 150 MW Β· in study
- Solar + storage project AG2-126, Vermillion CountySolar + storage Β· 150 MW Β· in study
- Solar project AI2-161, Vermillion CountySolar Β· 48.0 MW Β· in study
- Gas project J802, Vermillion CountyGas Β· 1,244 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem