Solar project GEN-2018-007, Grant County

Solar project GEN-2018-007, Grant County is a 150 MW solar request withdrawn in the SPP interconnection queue, in Grant County, South Dakota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedApr 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingOct 2025 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-007
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Summit 115kV Substation
Location
Grant County, South Dakota
Technology
Solar: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
27 April 2018
Proposed online date
October 2025
Came online
October 2025
Withdrawn
April 2023

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem