United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

BATTERY STORAGE Β· PJM

Battery storage project AB1-075, Baltimore County

Battery storage project AB1-075, Baltimore County is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Baltimore County, Maryland, connecting to BGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2015 (completed)
  2. Withdrawn / abandonedDec 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AB1-075
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
BGE
Connection point (POI)
Riverside 115kV
Location
Baltimore County, Maryland
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
17 September 2015
Proposed online date
December 2016
Withdrawn
December 2016

Location

Marker shows the centre of Baltimore County; the queue data does not give exact sites.