SOLAR Β· PJM

Solar project AH1-316, Dorchester County

Solar project AH1-316, Dorchester County is a 4.4 MW solar request withdrawn in the PJM interconnection queue, in Dorchester County, Maryland, connecting to DPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-316
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
DPL
Developer
Todd Solar LLC
Connection point (POI)
Todd 25 kV
Location
Dorchester County, Maryland
Technology
Solar: 4.4 MW
Total requested
4.4 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
11 September 2021
Proposed online date
December 2025
Withdrawn
July 2025

Location

Marker shows the centre of Dorchester County; the queue data does not give exact sites.

Power plants in Maryland Β· Transmission lines in Maryland

Other requests in Dorchester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem