United States › Grid › Interconnection queues › Ohio
GAS · PJMGas project AH1-699, Columbiana County
Gas project AH1-699, Columbiana County is a 69.0 MW gas request in interconnection study in the PJM interconnection queue, in Columbiana County, Ohio, connecting to ATSI.
Queue statusIn planning
- PlanningQueued Apr 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AH1-699
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Developer
- South Field Energy LLC
- Connection point (POI)
- Wellsville 345 kV
- Location
- Columbiana County, Ohio
- Technology
- Gas: 69.0 MW
- Total requested
- 69.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 4 April 2025
Location
Marker shows the centre of Columbiana County; the queue data does not give exact sites.
Other requests in Columbiana County
- Gas project AH2-106, Columbiana CountyGas · 69.0 MW · in study
- Kensington SolarSolar · 145 MW · suspended
- South Field Energy Power PlantGas · 1,152 MW · built
- Coal project G689, Columbiana CountyCoal · 560 MW · built
- Coal project R13, Columbiana CountyCoal · 350 MW · withdrawn
- Solar project AG2-663, Columbiana CountySolar · 40.0 MW · withdrawn
- Gas project AB1-178, Columbiana CountyGas · 19.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem