United States βΊ Grid βΊ Interconnection queues βΊ Ohio
COAL Β· PJMCoal project R13, Columbiana County
Coal project R13, Columbiana County is a 350 MW coal request withdrawn in the PJM interconnection queue, in Columbiana County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2006 (completed)
- Withdrawn / abandonedJun 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R13
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Tidd - Canton Central 345kV
- Location
- Columbiana County, Ohio
- Technology
- Coal: 350 MW
- Total requested
- 350 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 28 September 2006
- Proposed online date
- September 2011
- Withdrawn
- June 2008
Location
Marker shows the centre of Columbiana County; the queue data does not give exact sites.
Other requests in Columbiana County
- Gas project AH1-699, Columbiana CountyGas Β· 69.0 MW Β· in study
- Gas project AH2-106, Columbiana CountyGas Β· 69.0 MW Β· in study
- Kensington SolarSolar Β· 145 MW Β· suspended
- South Field Energy Power PlantGas Β· 1,152 MW Β· built
- Coal project G689, Columbiana CountyCoal Β· 560 MW Β· built
- Solar project AG2-663, Columbiana CountySolar Β· 40.0 MW Β· withdrawn
- Gas project AB1-178, Columbiana CountyGas Β· 19.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem