SOLAR Β· PJMSolar project AG2-663, Columbiana County
Solar project AG2-663, Columbiana County is a 40.0 MW solar request withdrawn in the PJM interconnection queue, in Columbiana County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedAug 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-663
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Pidgeon - Lisbon 69 kV
- Location
- Columbiana County, Ohio
- Technology
- Solar: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2021
- Proposed online date
- July 2025
- Withdrawn
- August 2022
Location
Marker shows the centre of Columbiana County; the queue data does not give exact sites.
Other requests in Columbiana County
- Gas project AH1-699, Columbiana CountyGas Β· 69.0 MW Β· in study
- Gas project AH2-106, Columbiana CountyGas Β· 69.0 MW Β· in study
- Kensington SolarSolar Β· 145 MW Β· suspended
- South Field Energy Power PlantGas Β· 1,152 MW Β· built
- Coal project G689, Columbiana CountyCoal Β· 560 MW Β· built
- Coal project R13, Columbiana CountyCoal Β· 350 MW Β· withdrawn
- Gas project AB1-178, Columbiana CountyGas Β· 19.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem