πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project 126, Garfield County

Onshore wind project 126, Garfield County is a 140 MW onshore wind request withdrawn in the West interconnection queue, in Garfield County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
126
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Dodge Junction 230 kV Substation
Location
Garfield County, Washington
Technology
Wind: 140 MW
Total requested
140 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
10 September 2021
Proposed online date
May 2025

Location

Marker shows the centre of Garfield County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Garfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem