BATTERY STORAGE Β· MISOBattery storage project J2372, Mclean County
Battery storage project J2372, Mclean County is a 200 MW battery storage request withdrawn in the MISO interconnection queue, in Mclean County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2372
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Bloomington Brokaw 138kV Substation
- Location
- Mclean County, Illinois
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- March 2026
- Withdrawn
- March 2023
Location
Marker shows the centre of Mclean County; the queue data does not give exact sites.
Other requests in Mclean County
- Twin Groves Storage IIBattery storage Β· 50.0 MW Β· agreement signed
- Twin Groves Storage IBattery storage Β· 50.0 MW Β· agreement signed
- Surplus; G876/G877Wind + storage Β· 400 MW Β· in study
- Onshore wind project J3991, Mclean CountyOnshore wind Β· 340 MW Β· in study
- Battery storage project AI1-024, Mclean CountyBattery storage Β· 300 MW Β· in study
- Onshore wind project J3681, Mclean CountyOnshore wind Β· 300 MW Β· in study
- Dawson SolarSolar Β· 300 MW Β· in study
- Battery storage project J4118, Mclean CountyBattery storage Β· 250 MW Β· in study
- Battery storage project AI1-023, Mclean CountyBattery storage Β· 200 MW Β· in study
- Onshore wind project J3566, Mclean CountyOnshore wind Β· 198 MW Β· in study
- Bright Stalk Generating FacilityOnshore wind Β· 150 MW Β· in study
- Bright Stalk Generating FacilitySolar Β· 150 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem